Date:
April 27th 2016
Time:
01:00AM until 01:30AM CST
Notes:
Power grid switch: This may effect some base dedicated and colocation services that are still utilizing our legacy power grid in the Mpls1 datacenter. Service should be restored within 30 minutes.
Date:
September 12th 2015
Time:
01:00 AM CST
Notes:
Upgrading Backup array for VPS Systems
Unscheduled maintenance: 1:30 AM CST
Configuration of core router ip stack may cause brief 5-10 minutes of down time from 1:30AM to 2:30 AM.